Adept at electrical installations and repairs, including advanced fiber work and control systems, I've significantly enhanced operational efficiency across multiple projects for Teca AS and others. My collaborative approach, combined with a knack for troubleshooting, ensures optimal system functionality and safety.
Oma Baatbyggeri at Stord (Production of aluminium catamaran)
Cable pulling all over vessel, termination of generator and switchboard panels.
Jotun A (Rosenberg) at Stavanger
MC, EIT, cable pulling, termination of field devices.
Northern Lights (Aker Solutions)( Co2storage ) at Kollsnes:
Installing equipment, fiber work, termination of cabinets,MC, TESTING and pulling cables.
Sunrise HDVC (Aker solutions) at Stord
Cable pulling at switchboard rooms, mounting, termination and MEASURING devices
There were 3 projects with this company that i made:
EX inspection, EX repair jobs, closing of MCT, building of cable trays and bridges, cable pulling, working with fire alarm and HVAC system.
There were done all kind of electrical jobs from installation and termination to commissioning and loop testing at such projects like schools, office buildings, apartments, hospital, terminal at airport and hydro power station.
Johan Sverdrup P2.
Connecting up switchboards, termination of field equipment, building of cable ladders and trays. Measuring, making MC checking and LOOP TESTING.
M\S Vessels, Fish feed barges
Cable pulling, instalation of cable trays by ISO drawings, collecting and inspection of roxtecs.
Instalation and termination of lighting, smoke detectors, door magnets, pumps, generators and many other devices.
Installation and connection of basic home electrical components like:
Sockets, lightning, switchboard panels, LED, Wi-Fi, Fire alarm system, floor heating
Installation and connection of basic home electrical components like:
Sockets, lightning, switchboard panels, LED, Wi-Fi, Fire alarm system
DSB - more than 6 years
ex, fse, fallprotection courses
Driving license cat. B